BS英标:混凝土与砌体后锚固选择安装规程 8539-2012.pdf

BS英标:混凝土与砌体后锚固选择安装规程 8539-2012.pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:3.5 M
标准类别:建筑标准
资源ID:49022
免费资源

标准规范下载简介

BS英标:混凝土与砌体后锚固选择安装规程 8539-2012.pdf简介:

"混凝土与砌体后锚固选择安装规程 8539-2012.pdf" 是一份关于混凝土和砌体结构后锚固技术的安装标准和指南。该规程由中国建筑科学研究院发布,编号为8539-2012,旨在规范和指导在已建结构中(如混凝土和砌体结构)进行后锚固(如安装锚栓、膨胀管等)的设计和施工过程。后锚固技术常用于结构加固、设备固定和扩建工程等,以增强结构的承载能力和连接性能。这份规程详细规定了锚固件的选择、锚固深度、安装方法、质量检验等方面的要求,确保了施工的安全性和结构的稳定性。

BS英标:混凝土与砌体后锚固选择安装规程 8539-2012.pdf部分内容预览:

5.3.2 Anchor reliability

Specifiersshouldsatisfythemselves selectedanchorwillfunctio reliably in the range of conditions which could be encountered on site.

JT∕T 776.4-2010 公路工程 玄武岩纤维及其制品 第4部分:玄武岩纤维复合筋ishStandardsInstitution

BS8539:2012

5.3.3Base material

BRITISH STANDARD

Not all anchors work in all base materials, so the specifier should ensure that the proposed anchors are suitablefor thebase material concerned. NOTEGuidanceon concrete is given in 5.3.3.2,and on masonry in5.3.3.3

5.3.3.2Concrete

Productcertification/inspection/testing.UsersofthisBritishStandardareadvisedto considerthedesirabilityof selecting anchorswitha EuropeanTechnical Approval (ETA) 2).Annex D, Figure D.1 shows the selection process foranchors in concrete with andwithoutan ETA

5.3.3.2.1 Structural form

The specifier should evaluate thetype and strength of concrete structure,as there might be factors which could influence the choice of anchor or its positioning.

COMMENTARY ON 5.3.3.2.2

MMENTARY ON 5.3.3.2.

leBritishStandards Instit

At the time of publication of this British Standard, it is expected that European Technical Approval Guidelines will be replaced by European Assessment Documents and European Technical Approvals will be replaced by European Technical Assessments upon implementation of EURegulation 305/2011(Construction Products Regulation)[2]in July2013

BRITISH STANDARD

5.3.3.2.3Concrete strength

BS8539:2012

COMMENTARYON5.3.3.2.3

IMENTARY ON 533.23

Structural dimensior

Specifiersshouldtakeinto accountthefollowingdimensionallimitationsofthe structure, as these limitations affect anchor performance.

a)Edgeandspacingparameters.

All anchors require an amount of the base materialaround them,to support the forces induced during their installation and/or those transferrec fromthe fixturein service.Datashould be acguired from themanufacturer identifying the edge distances and centre spacings that will provide full performance (characteristic edge distance, Cer or characteristic spacing, s.r), and absoluteminimum dimensions(minimumedge distance,Cminor minimum spacing, Smin), for which performance should be reduced accordin to the prescribed design model (see Figure 3). NOTE 1Anchors conforming to ETAG 001, Parts 1 to 5 ([8] and [11] to [14] will, depending on theiroption, include this data.Some options allow design using minimumdimensions, while others allow anchors tobe specified onlyat the critical distances with no closer dimensions allowed. There is, however, a relationship between the anchor spacing and the edge simultaneously with the minimum spacing, Smin. Minus tolerances should not be specified.

All anchors require an amount of thebase materialaround them,to support the forces induced during their installation and/or those transferred fromthe fixturein service.Datashould be acguired from themanufacturer identifying the edge distances and centre spacings that will provide full performance (characteristic edge distance, Cer or characteristic spacing, s.r), and absoluteminimum dimensions(minimumedge distance,Cminor minimum spacing, Smin), for which performance should be reduced accordin to the prescribed design model (see Figure 3). NOTE 1Anchors conforming to ETAG 001, Parts 1 to 5 ([8] and [11] to [14] will, depending on their option, include this data.Some options allowdesign using minimum dimensions, while others allow anchors tobe specified onlyat the critical distances with no closer dimensions allowed. There is, however, a relationship between the anchor spacing and the edge Minus tolerances should not be specified.

ishStandardsInstitution

BS8539:2012

b)Embedment depth

BRITISH STANDARD

Theembedmentdepthshouldbetakenintoaccountinthecalculation tensile resistance of the anchor

neembedmentdepthshouldbetakenintoaccountinthecalculationot ensileresistanceoftheanchor

BRITISH STANDARD

BS8539:2012

C)Structural thickne

GB∕T 38706-2020 陶瓷行业能源管理体系实施指南5.3.3.2.5Reinforcement

COMMENTARY ON 5.3.3.2.5

ishStandardsInstitution

BS8539:2012

DB62∕T 25-3122-2016 全钢附着式升降脚手架安全技术规程5.3.3.3Masonry

COMMENTARYON5333

BRITISH STANDARD

©版权声明
相关文章