标准规范下载简介和预览
DB11 938-2012 绿色建筑设计标准 英文版.pdf简介:
DB11/938-2012 "Green Building Design Standard" (绿色建筑设计标准) 是一份由中华人民共和国北京市住房和城乡建设委员会发布的标准。这份标准主要针对绿色建筑设计,目的是为了促进可持续发展的城市建设,推动节能减排,提高建筑的能源效率,以及保护环境。
The document covers a wide range of topics in green building design, including principles of energy efficiency, resource conservation, indoor environmental quality, water management, waste reduction, and ecological design. It sets guidelines for the selection and use of environmentally friendly materials, the design of building systems to minimize energy consumption, and the integration of renewable energy sources.
In English, the document is titled "Standard for Green Building Design" and serves as a reference for professionals, architects, and developers involved in the planning, design, and construction of sustainable buildings in Beijing, adhering to international best practices and local regulations for environmental sustainability.
Please note that the PDF version may vary depending on its availability and might require a paid subscription or purchase to access the full text.
DB11 938-2012 绿色建筑设计标准 英文版.pdf部分内容预览:
WaterSavingEquipment andSanitaryWa
9.4.1Reclaimedwaterfacilitiesmustbedesignedandconstructedforthefollowingnewlybuilt
Obviousidentifiersofnontraditionalwatersourceshallbearrangedinthepositionsof cisterns (watertanks),valves,watermeters,turncocks andwateroutlets; 3Lockingdevices shallbe arranged on theturncocksof nontraditional watersource inpublic placesand thewateroutlets forgreening.
10.1GeneralRequirements
DB33∕T 1221-2020 建筑施工承插型轮扣式钢管模板支架技术规程0.2Energy Transportation and Distributio
Energy Transportation and Distribution
EC(H)R = Q At
10.3HeatandColdSource
10.4Control and Detection
11.1 General Requirements
1.2PowerSupplyand DistributionSystem
11.3Lighting
11.4Electrical Equipment
11.5Metering and Intelligentization
12.1 General Requirements
12.2.1Theexisting treeson site shall befullyprotected andutilized
12.2Greening
12.3Waterscape
12.5Lighting
i3InteriorDecorationDesign
13.1GeneralRequirements
13.2DesignRequirements
13.3Selection of Decoration Materials
14SpecialDesignControl
14.1 General Requirements
14.2BuildingCurtain Wall
14.3Reclaimed water Treatment and RainwaterRecycling Systems
.4SolarThermal andPhotovoltaic Systems
14.4.6Thesolarhotwatersystemshallbeeguippedwithanautomaticc
4.5HeatPumpSyste
【江苏省】城市规划管理技术规定 苏州市实施细则之一“指标核定规则”(2015版)4.5.2The design of
pollution shall beproduced to theundergroundwaterresources; 2 For soil source heat pump system, the heat balance shall be calculated between the heat extraction on the source side and the heat rejection, so as to avoid the continuous rising orfalling of soil temperaturecausedbythe imbalancebetweenheatextractionandheatrejection. 14.5.4Heatpumpsystemsshallbeprovidedwithmeteringdevicesbyitemsforheat supplyand drivingenergy
14.6IceStorageSystem
14.6IceStorageSystem
14.7Building Intelligent Systems
框架法院办公楼毕业设计(含计算书,图纸)continueA. 0.106 Electricity (the part in grey background is optional)Filled by:D19 Lighting power density ofD20 Target energy efficiency ofmain spacestransformerBrief description of design (can be attached below)07 LandscapeFilled by:D21 Lighting power density of building facade nightscapeD24 Shading ratio of sidewalk and bicycle roadD22 Solar radiation absorption factor ofD25 Number of arbors/100m² green spacerigid pavement (average value)D23 Shading ratio of outdoor parking spacesD26 species of woody plantsBrief description of design: (can be attached below)08 Interior DecorationFilled by:D27JRatio of construction and decoration integrationBrief description of design:09 NotesFilled by:(Brief introduction of project features)Description:1, The design organization shall fill in truthfully in correspondence to different design stages according to the actual design situation.2. Please refer to Chapter 4 “Index System" in this standard for the index reference limits and corresponding calculation methods.3. The parts in grey background are optional contents in scheme stage.4. The description part can be attached below if excessive.A,0.2IntegratedReviewSheet(PublicBuilding,Scheme stage)Table A, 0. 2Integrated Review Sheet (Public Building, Scheme stage)01Basic InformationFilled by:Project nameLocationFloor aream2Total land areahm2Floor area ratio(Commercial housing,Building typeBuilding heightindemnificatory housing)OwnerContact person and wayDesign organizationContact person and wayConsulting organizationContact person and wayDesign starting and ending timeDesign stageProject progressApplication time plannedApplication level planned62·
continueA.0.4