e+h Transmitter_FMU90 超声波液位计 英文版

e+h Transmitter_FMU90 超声波液位计 英文版
标准编号:
文件类型:.pdf
资源大小:1.7M
标准类别:综合标准
资源ID:37852
免费资源

标准规范下载简介和预览

e+h Transmitter_FMU90 超声波液位计 英文版简介:

The e+h Transmitter_FMU90 is an ultrasonic liquid level meter developed by Endress+Hauser, a leading global provider of measurement technology. This advanced device is designed to accurately and reliably measure the level of liquids in a wide variety of applications and industries, including chemical, petrochemical, water and wastewater treatment, and energy production.

The FMU90 utilizes cutting-edge ultrasonic technology to determine the distance between the transmitter and the liquid surface. It emits high-frequency sound waves which travel through the air and are reflected back by the liquid surface. By measuring the time it takes for these waves to travel to the liquid surface and back, the FMU90 calculates the level of the liquid with exceptional precision.

Key features and benefits of the e+h Transmitter_FMU90 include:

1. Non-contact measurement: The FMU90 does not require any contact with the liquid, eliminating concerns about corrosion, wear, and maintenance issues often associated with contacting technologies.

2. Wide measuring range: The device is capable of measuring liquid levels over a wide range, from a few centimeters to several meters, making it suitable for various tank sizes.

3. Robust design: The FMU90 is built to withstand harsh industrial environments, with a durable housing and protection against dust, moisture, and temperature fluctuations.

4. User-friendly interface: The transmitter features a clear, easy-to-read display and intuitive menu navigation, allowing users to quickly access and configure measurement settings.

5. Remote communication capabilities: The FMU90 can be integrated into existing process control systems through various communication protocols (e.g., HART, Profibus, Foundation Fieldbus), enabling remote monitoring and control.

6. Automatic temperature compensation: The device automatically corrects for temperature-induced changes in the speed of sound, ensuring accurate measurements even in fluctuating temperatures.

7. Advanced diagnostic functions: The FMU90 provides real-time information on its performance, allowing early detection of potential issues and minimizing downtime.

8. Flexibility: The FMU90 can be customized with a variety of mounting options and process connections to suit different application requirements.

In summary, the e+h Transmitter_FMU90 ultrasonic liquid level meter is a highly accurate, reliable, and versatile solution for liquid level measurement in challenging industrial environments. Its innovative technology and user-friendly design make it a preferred choice for process engineers and plant operators worldwide.

e+h Transmitter_FMU90 超声波液位计 英文版部分内容预览:

Basic setup

Endress+Hauser

Prosonic S FMU90

DB∕T 29-167-2019 天津市再生水设计标准Prosonic S FMU90

CertificatesandApprovals

External standards and quidelines

Endress+Hauser

Prosonic S FMU90

Orderinginformation

Accessories

Endress+Hauser

Prosonic S FMU90

Endress+Hauser

Prosonic S FMU90

Endress+Hauser

Prosonic S FMU90

Application examples

新12D4常用风机、水泵控制及照明装置Endress+Hauser

Prosonic S FMU90

Endress+Hauser

Prosonic S FMU90

Prosonic S FMU90

ThetemperaturesensorOmnigradSTR61canbeusedwiththeFMU90,seealso→20and→22 More information can be found in the following documents: TI01029T

Endress+Hauser

GB∕T 24967-2010 钢质护栏立柱埋深冲击弹性波检测仪Endress+Hauser People for Process Automation

©版权声明
相关文章