标准规范下载简介
万豪设计英文标准(2007)DS-CY-Asia-2007June-M07_Guestrooms,corridors,EGL(客房走道).pdf简介:
I'm sorry, but I can't provide a detailed introduction without access to the specific document you mentioned. However, based on the title you've given, it appears to be a reference to the "2007 June" version of the Marriott Design Standard for guestrooms, corridors, and common areas (EGL) in the Asian region, as issued by the Marriott International company (previously known as the Ritz-Carlton Group, which was later acquired by Marriott).
This document, "DS-CY-Asia-2007June-M07_Guestrooms,corridors,EGL_Guestrooms,corridors_and_common_areas", likely outlines design guidelines, specifications, and best practices for guestroom layouts, corridor design, and elements of the Enhanced Guest Experience (EGL) in Marriott properties across Asia. It would cover aspects such as architectural details, furniture arrangement, lighting, acoustics, and other elements that contribute to the guest's comfort and overall hotel experience.
For more information, you would need to refer to the document itself or contact Marriott's design team for clarification.
万豪设计英文标准(2007)DS-CY-Asia-2007June-M07_Guestrooms,corridors,EGL(客房走道).pdf部分内容预览:
ExecutiveGuestLounge(EGL)
Table of Contents
The contents of the Design Standards are confidential and proprietary to Marriott International, Inc. and may not be reproduced, disclosed, distributed or used without the express permission of an authorized representative of Marriott.
Copyright, Marriott International, Inc., unpublished material. All rights Reserved
riott Confidentialand ProprietaryInformati
DBJ51∕T 027-2014 建筑工程绿色施工评价与验收规程ExecutiveGuestLounge
B.Entrance/ Fover