SY/T 6664-2013 石油钻机用偶合器机组.pdf

SY/T 6664-2013 石油钻机用偶合器机组.pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:31.5 M
标准类别:机械标准
资源ID:54478
免费资源

标准规范下载简介

SY/T 6664-2013 石油钻机用偶合器机组.pdf简介:

"SY/T 6664-2013 石油钻机用偶合器机组.pdf" 是一份由中国石油天然气行业标准委员会发布的标准文档。该标准主要针对石油钻机行业中使用的偶合器机组设计、制造、检验和使用提出了详细的要求。偶合器是一种机械装置,用于传递动力,常用于钻机等设备上,帮助将动力从一个旋转部件传递到另一个旋转部件。

这份标准涵盖了偶合器机组的选型、安装、运行维护、故障诊断以及安全规定等方面,目的是为了保证石油钻机的正常运行,提高设备的可靠性和使用寿命,同时确保工作人员的人身安全。它适用于石油钻井及相关行业的设备设计和操作人员参考,是行业内的技术规范之一。

SY/T 6664-2013 石油钻机用偶合器机组.pdf部分内容预览:

Issued byNationalEnergyAdministration,P.R.C

2Normative references

Fluid coupling set for drilling rig

3Terms and definitions

L95G407 预应力砼平板-山东省标准图集3.1fluid coupling

3.3prime mover

renerictermsforpowerinstallationsuchasen gineandelectricmotor

3. + fluid coupling set

3.5engine fluid coupling se

3.10specific heat consumption of set

4Modelsandbasicparameter

Designation method of set models is as shown in Figure1.

5.+Basic requirements for electric motor

The basic requirements for elcctric motor shal be in accordance with GB 755

Rated condition

Requirements for rclevant temperaturc and pres. sure of the set in rated condition are as shown in Table 1.

IRelevanttemperatureandpressureinrated

5.5.2Standard reference condition for engine fluid coupling set

0.5.2 Standard reference condition for engine fluid coupling set

Total barometric pressure:p,= 1kPa; Airtemperature:T,=298K(t,=25℃); Relative humidity: $,=30%; Coolant temperature of turbocharged inter cooler: T. = 298 K (t. = 25℃) If ambient condition is not in conformitywit

Total barometric pressure: p,= 1) kPa; Airtemperature:T,=298K(t,=25℃); Relative humidity: $,=30%; Coolant temperature of turbocharged inter cooler: T. = 298 K (t. = 25℃) If ambient condition is not in conformitywith

Table 3 (Continue)

5.10Safety requirements

torshall conformtoGB14711

5.11.2The fire protection requirements of the

5.12Tightness

There shall be no leakage of air/gas, oil/fue and water from all sealing junction surfaces and pipe joints of the set.

There shall be no leakage of air/gas, oil/fuel and water from all sealing junction surfaces and pipe joints of the set.

5.13Surface pain

The requirements for surface paint shali conform to IB/T.5946

6Test methods

6.ITest condition and requirements

.l.lDuringthe of the main parameters of the set shall be in ac cordancewiththerequirementsinGB/T 6072.3. 6.1.2The coaxiality errorfortheconnection of the setwithdynamometershall conformto nanufacturer's technical document of product. 6.1.3The pneumatically controlled air supply oressureforcouplingcontrol valveshall conform to the requirements given in the technical docu

able 4Performance parameters of transmission oil

.2Startingperformance

The starting performance test of engine fluid coupling set shall be performed as per SY/T 50.30)

coupling set shall be performed as per SY/T 50.30)

6.3Tightness test

5.3Tightness test

Tightness test shall be performed as per the re quirements specified in the technical document of product.

6.4Function tests of auxiliaries for the set 6.+.1Measurement of fan speed

6.+Function tests of auxiliaries for the set

Measurement of fan speed shall be performed for the engine fluid coupling set fitted with fan speed regulating device. When coolant outlet

6. 4.2Function test of temperature control valve

Thetest of valve opening and closing function shall be made for the engine fluid coupling set

Thetest of valve opening and closing function shall be made for the engine fluid coupling set 31

6. +.3Test of water heating device

6.5Idle running test

Loadcharacteristictest

6.6.2Load characteristictestfor electric motor

When the electric motor fluid coupling set runs at rated speed,andtransmission oil temperature risestoloadingtemperature(60℃)orabove. the load increases gradually. Measure and take theparameters respectively such as output torque and speed under different loads.

6.6.3Inspection items

6.6.4 Record

the method given in GB/T 2820.9

6.13Measuring recor

DBJD25-60-2018 甘肃省建设工程施工机械台班定额(除税)Ouring thetestmeasure the test data once an nour andkeep a record.For the operating condi tion of less than1h,makeonemeasurementat cachoperatingcondition

loise measurement shall be performed as per nerequirements inGB/T1859

6.14 Safety inspection

The safety inspection of the set shall be per formed as per 5. 10.

6.15Fireprotection inspection

Fire protection inspection shall be made as per 5.11. 6.16Surfacepaint Surface paint shall be in accordance with the re quirements stipulated in JB/T 5946

7Inspection rules

7Inspection rules

T∕CHTS 20016-2021 公路桥梁各向异性摩擦摆减隔震支座7.IType inspection

©版权声明
相关文章