GSA2003标准规范下载简介
GSA2003 美国联邦总务署 新联邦办公楼和重大现代化项目的连续倒塌分析和设计指南2003简介:
"GSA 2003",全称为"General Services Administration's Design Guide for the Analysis and Design of Continuous Operations in New Federal Office Buildings and Major Rehabilitation Projects, 2003",是由美国联邦总务署(General Services Administration,GSA)发布的指导性文件。该指南发布于2003年,主要针对的是美国联邦政府的新办公大楼建设和重大改造项目。
这份指南的核心目的是为了保障在联邦政府建筑中的持续运营,尤其是在灾难或紧急情况下,如地震、火灾等。它强调了建筑的结构安全、系统冗余、灾难恢复计划以及应急管理系统的设计,旨在确保政府机构在面对突发事件时仍能保持基本运营功能,减少中断时间和损失。
它涵盖了设计标准、建筑策略、建筑设备和系统的抗灾能力、以及如何进行风险评估和管理等多个方面,对提高联邦政府建筑的韧性、安全性和可持续性具有重要意义。它是美国公共建筑设计和建设的重要参考文件,也是政府建筑行业遵循的重要法规之一。
GSA2003 美国联邦总务署 新联邦办公楼和重大现代化项目的连续倒塌分析和设计指南2003部分内容预览:
Figure3.6.Flowchart6.TobeusedwithStep3oftheexemptionprocess
Section 4. Reinforced Concrete Building Analysis
4.1 New Construction
《老年人建筑设计规范 JGJ122-99》All newlyconstructedfacilities shallbedesignedwiththeintent of reducingthe potentialforprogressivecollapseas aresultof anabnormalloadingevent,regardless oftherequiredlevel ofprotection.TheprocesspresentedintheseGuidelinesconsists of an analysis/redesign approach.This method is intended to enhance the probability that iflocalizeddamage occurs as theresultof anabnormalloadingevent,the structurewillnotprogressivelycollapseorbedamagedtoanextentdisproportionate to the original cause of the damage.Theflowchart, shown in Figure 4.1, outlines this process for reducing the potential for progressive collapse in newly constructed facilities.
Figure4.1.Process for reducing thepotentialforprogressive collapse innew construction
Structural design guidance,although not a requirement of these Guidelines,is provided for consideration duringthe initial structural designphase and prior to performingtheprogressivecollapseanalysisoutlinedinSection4.1.2tominimizethe mpactonthebuilding's final design.These Guidelines should actas a supplement to he Interagency SecurityCommittee(ISC)SecurityDesignCriteriaforNewFederal Office Buildings and MajorModernization Projects,which states that mitigation of progressive collapsebeaddressed in thedesign ofnew structures.
ConsiderthestructuralconfigurationshowninFigure4.2.Alongthelengthofthe beam,negativereinforcing steel (topsteel)isprovidedinareas where negative momentsareinducedbythedownwardloading.Likewise,positivereinforcingsteel (bottom steel)isprovided in areas wherepositive moments areinducedby the downwardloading.ACI318includesaprovisionforstructuralintegrity reinforcementthatrequiressometopandbottomreinforcementtobecontinuousfor beamssuchasthoseshowninFigure4.2TheamountofreinforcementthatACI318 requirestobecontinuousmaynotbesufficienttopreventprogressivecollapsefor instantaneousremovalofacolumn
Figure4.2.Asketchdepictingthereinforcementschemefor abeamdesignedfor gravityloads only
Figure4.3.Responseof thebeam showninFigure4.2afterthelossofprimal columnsupport,showstheinabilitytoprotectagainstprogressive collapse.
4.1.2Analysis
The following static linear elastic analysis approach may be used to assess the potential for progressive collapse in all newly constructed facilities.Other analysis approachesmayalsobeused,suchasthosediscussed inSection2.3,buttheanalysis considerations (Section 4.1.2.3) and allowable extents of collapse (Section 4.1.2.4), mustbeusedintheassessmentofthepotentialforprogressivecollapse.
The followingprocedure uses a staticlinearelastic,approach coupled withthe following:
Thefollowing procedureuses a staticlinear elastic,approachcoupled with the
Criteriafor assessing the analysis results A suiteof analysis cases Specific loading criteria to be used in the analysis
4.1.2.1Analysis Techniques
4.1.2.2 Procedure
Thepotentialforprogressivecollapsecanbedeterminedbythefollowingprocedure.
Step2.Theresultsfrom the analysesperformedin Step1 shall be evaluated by utilizing the analysis criteria defined in Section 4.1.2.4.
4.1.2.3 Analysis Considerations and Loading Criteria
SY/T 4122-2020 油田注水工程施工技术规范.pdfThefollowing analysis considerations shall beused intheassessment forprogressive collapsefor typical structural configurations.Atypical structural configurations are addressed in Section 4.1.2.3.2
4.1.2.3.1Typical Structural Configurations.
Facilitiesthathavearelativelysimplelayoutwith noatypicalstructural configurationsshallusethefollowinganalysisscenarios:
Framed or Flat Plate Structures
Exterior Considerations
Thefollowing exterior analysis cases shall be considered in the procedure outlined in Section 4.1.2.2.
1 Analyzefortheinstantaneouslossofa column for one floor above grade (1 story) locatedatornearthemiddleof theshort side of the building. 2Analyzefortheinstantaneouslossofa columnforonefloorabovegrade(1 story) located at or near the middle of the long side of the building. 3Analyzefortheinstantaneouslossofa Plan column for one floor above grade (1 story) View located at the corner of the building.
Interior Considerations
RBT 048-2020 机械行业 铸造企业质量管理体系 要求.pdfFacilitiesthathaveundergroundparkingand/oruncontrolledpublicgroundfloon areas shall usethefollowing interioranalysis case(s)intheprocedure outlined in Section 4.1.2.2