广州新电视塔复核分析报告_完成稿_.pdf

广州新电视塔复核分析报告_完成稿_.pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:3.3 M
标准类别:建筑标准
资源ID:54188
免费资源

标准规范下载简介

广州新电视塔复核分析报告_完成稿_.pdf简介:

广州新电视塔复核分析报告_完成稿_.pdf部分内容预览:

表23客地装零数取值(报器安评报告)电值

参数 7, (移) (fms (水 (frus ( T (移) Ye Prus 平向) 直向) 小震 0.1 0.40 1.00 2.25 0.1734 0.1127 中需 0/ 0.60 0.95 2.25 0.4452 0.2894 大霞 0.1 0.70 0.90 2.25 0.7732 0.5026

广州新电视塔复核分析报告小霞中震地面设计地震影响系数及其曲线如下所示:周期(s)加速度(n/s)周期))加(n/s)1.750.43801.751.6756表24反应进(小露、中露)数据1.800.42551.801.6307小霞中震1.850.41371.851.5882周期)加速(n/s)周期(s)加速度(n/s)1.900.40241.901.54780.000.76470.001.96331.950.39181.951.50960.051.38510.053.33362.000.38172.001.47310.102.00550.104.70382.050.38022.051.43850.152.00550.154.70382.100.37872.101.40540.202.00550.204.70382.150.37732.151.37390.252.00550254.70382.200.37582.201.3438 0.302.00550.304.70382.250.37432.251.31500.352.00550.354.70382.300.37282.301.28740.402.00550.404.70382.350.37132.351.26100.451.77620.454.70382.400.36982.401.23560.501.59340.504.70382.450.36832.451.21130.551.44430.554.70382.500.36692.501.18790.601.32040.604.70382.550.36542.551.16550.651.21590.654.35442.600.36392.601.1439 0.701.12640.704.05412.650.36242.651.12300.751.04910.753.79322.700.36092.701.10300.800.98160.803.56432.750.35942.751.08360.850.92210.853.36192.800.35792.801.06500.900.86940.903.18162.850.35642.851.04690.950.82220.953.02002.900.35502.901.02951.000.77991.002.87432.950.35352.951.01271.050.74161.052.74223.000.35203.000.99641.100.70691.102.62193.050.35053.050.99291.150.67531.152.51193.100.34903.100.98931.200.64631.20 2.41093.150.34753.150.98581.250.61971.25 2.31783.200.34603.200.98221.300.59511,30223183.250.34453.250.97871.350.57241.352.15203.300.34313.300.97521.400.55131.402.07793.350.34163.350.97161.450.53171.452.00873.400.3401 3.400.96811.500.51351.501.94413.450.33863.450.96451.550.49641.551.88363.500.33713.500.96101.600.48041.601.82683.550.33563.550.95741.650.46541.651.77343.600.33413.600.95391.700.45131.701.72313.650.33273.650.9503北京市建筑设计研究院

广州新电视塔复核分析报告小霞中震小霞中震周期()加速度(n/)周期(s)加速度(n/s)周期(s)加速度(n/s)周期))加速度(n/s)3.700.33123.700.94685.650.27325.650.80853.750.32973.750.94325.700.27175.700.80503.800.32823.800.93975.750.27025.750.80153.850.32673.850.93625.800.26875.80 0.7979 3.900.32523.900.93265.850.26725.850.79443.950.32373.950.92915.900.26575.900.79084.000.32224.000.92555.950.26435.950.78734.050.32084.050.92206.000.26286.000.78374.100.31934.100.91846.050.26136.050.78024.150.31784.150.91496.100.25986.100.77664.200.31634.200.91136.150.25836.150.77314.250.31484.250.90786.200.25686.200.76954.300.31334.300.90436.250.25536.250.76604350.31184.350.90076.300.25386.300.76254.400.31044.400.89726.350.25246.350.75894450.30894.450.89366.400.25096.400.75544.500.30744.500.89016.450.24946.450.75184.550.30594.550.88656.500.24796.500.74834.600.30444.600.88306.550.24646.550.74474.650.30294.650.87946.600.24496.600.74124.700.30144.700.87596.650.24346.650.73764.750.29994.750.87246.700.24206.700.73414.800.29854.800.86886.750.24056.750.73064.850.29704.850.86536.800.23906.800.72704.900.29554.900.86176.850.23756.80.72354.950.29404.950.85826.900.23606.900.71995.000.29255.000.85466.950.23456.950.71645.050.29105.050.85117.000.23307.000.71285.100.28955.100.84757.050.23157.050.70935.150.28805.150.84407.100.23017.100.70575.200.28665.200.84047.150.22867.150.70225.250.28515.250.83697.200.22717.200.69875.300.28365.300.83347.250.22567.250.69515.350.28215.35 0.82987.300.22417.300.69165.400.28065.400.82637.350.22267.350.68805.450.27915.450.82277.400.22117.400.68455.500.27765.50 0.81927.450.21967.450.68095.550.27625.550.81567.500.21827.500.67745.600.27475.600.81217.550.21677.550.6738北京市建筑设计研究院

广州新电视塔复控分新报票

为了确定广州新电视塔区域风况 正确可靠,风气候研究、风洞 验及分析已经分别在广东省气候与农业气象中心、广东省建筑科学研究院以及同济大学土本工程防灾国家 重点实验室完成 这些研究包括: 风气候和现场电形地貌。以获得更可靠的风速估算数据,以适用于广州新电视塔这样高度的建筑设计需 片断上的风洞试验,以测量代表性塔体楼层的风力。测试结果与合适的分析风整合,给出包括 塔基在内的所有高度上的风荷载数据。分析风将给出塔体所有高度上的加速度等各种风效应数据。 全气动弹性上的风洞试验研究,以测量所有代表性楼层的风力和风效应。测试结果将给出包括塔基 在内的所有高度上的风荷载数据和风起的加速度数据

为了获得广州新电视增钢结构及其主体结构温度随环境温度气候情况波动的变化,进行了温度影模拟 分析研究。研究采用动态热模拟进行分析,重点是: 定同一高度层在某一时刻24根钢柱之间,24根斜撑之间的最大温度差: 某一根立柱/斜撑在一天中某时刻的表面温度相对当时环境温度干球温度的最大差值: 全球变暖对立柱和除表面温度的影响 模拟分析给出了夏季和冬季太阳辐射最大情况下的模拟分析结果,计算结果用于结构工程进一步的设计 分析

)、分析软件 弹性分析采用MIDAS/Gen通用有限元进行 MIDAS/Gen 是MIDAS 系划数之二, 1989 开发。Gen 是General structure desisn Svstem foe

wndows“的缩写,它是一套为了能够迅理完成对结构的分析与设计面并发的建筑及土本结构通用的结构分析 与优化设计软件 MIDAS/Gen在开发阶段,通过大量例题与理论值的对比,与其他结构计算软件的比较鉴定,并通过大量 的工程应用,证期了其准性,

wndows“的缩写,它是一套为了能够迅理完成对结构的分析与设计面并发的建筑及土本结构通用的结构分析 与优化设计软件 MIDAS/Gen在开发阶段,通过大量例题与理论值的对比,与其他结构计算软件的比较鉴定,并通过大量 的工程应用,证期了其准性,

表5设2主注的能正系器

广州新电视塔复控分新报票

GA 767-2008 消防控制室通用技术要求广州新电视塔复核分析报告图5.1整体图5.2铜结构外筒图5.3凝土核心筒图5.4楼板10北京市建筑设计研究院

广州新电视塔复控分新报票

©版权声明
相关文章