YBT 4543-2016 英文版.pdf

YBT 4543-2016 英文版.pdf
标准编号:
文件类型:.pdf
资源大小:4.7 M
标准类别:建筑标准
资源ID:53021
免费资源

标准规范下载简介和预览

YBT 4543-2016 英文版.pdf简介:

"YBT 4543-2016" 是一个标准编号,它通常代表中国国家标准(Chinese National Standard)。"YBT" 是"冶金行业标准"(Yard, Building, and Transportation Industry Standards)的缩写,而 "4543-2016" 是该标准的版本号和发布年份。2016年发布的YBT 4543-2016 可能是关于冶金行业的某个具体技术规范或质量标准,但没有具体的PDF文件内容,所以无法提供详细的介绍。要了解具体内容,你需要查阅该标准的官方英文版或者找到相关的专业解读资料。

YBT 4543-2016 英文版.pdf部分内容预览:

g)Quantity andlength; h) Other requirements .

g)Quantity andlength n)Otherrequirements。 6Sizeandtolerance

《非烧结砖砌体现场检测技术规程 JGJ/T371-2016》YB/T45432016

Table1 permissible tolerance of cableleng

6.3 When the designed length L of a cable is large, the effect of temperature difference between factory and construction site shall be taken into consideration.The measured temperatures shall beindicated beforedelivery.

When the designed lengthLof a cableis Iarge, the effect of temperature differenc etween factoryand constructionsite shalibetaken into consideration. The measure emperaturesshall beindicatedbeforedelivery.

7 Technical reguirements

7.1Materials

7.1.1Steel strand

7. 1.2 Anchorage

7. 1.3 Hot casting material

YB/T 45432016

7.3Appearance

7.3.1The surface of the steel strand in the cable shall be clean and tidy, shall not naveloose,rust and other defects, its color is allowed to changeafter being exposed inair. 7.3.2The surface of anchors shall not have defects of cracks,trimmings,indentations, scratches,andshrinkagecavities,etc. 7.3.3Innatural state, the cable shall not show spiral curl. 7.4Mechanicalproperties 7.4.1Over tensioning When a hot cast cable is finished, the over tensioning test shall be carried out at 1.25 times the designed tension value (not less than 45%of the minimumbreaking tensile force calculated).After thetensioning,the relativeoutward displacement(seefigure1)between steel strandand anchor nents of table 2

Table2outwarddisplacement

7.4.2 Static loading

7.4.2 Static loading

Fch, min= AXR,XK,/1000. F...= A.XR,XK, XK./1000.

In theformula

Fch, min= AXR,XK,/1000. F...= A.XR.XK,XK,/1000.

Feh,sin—The theoretical minimum breaking tensile force of the hot cast cable (kN); Fe.sin—The theoretical minimum breaking tensile force of the swaged cable(kN); ANominal cross section of the steel strand (mm); R,—Nominal tensile strength of the steel wire(MPa); K,Strength reduction coefficient of the steel strand, the K1 vales are indicated in K,Strength reduction coefficient of the pressing.its value is 0.9

YB/T45432016

the theoretical minimum breaking tensile force

Strength reduction coefficient of the steel stra

7.4.3 Fatigue prope

7.4.3Fatigue property

8.1Appearance

8.3Mechanical property

8.3.1 0ver stretching

8.3.1.1 Using a hydraulic equipment to load, the precision of the hydraulic sensor shal not belower than1.5grade. 8.3.1.2The loading precisionof theequipment for over stretchingmust bekept withir ±o.2% in themeasurement range.

YB/T 45432016

8.3.2Staticloading

.3.Z.11hesampies directly on finished steel strand,

Inspectionrule

9.1Inspection classificatior

The cable inspection includes type inspection and delivery inspection 9.2Delivery inspection

9.2 Delivery inspectior

9.2.1Inspection item

YB/T45432016

YB/T45432016

9.2. 2 Lot grouping and sampling

Thesamecableproductsproduced withthesamebatchofrawmaterials,thesame specification,and the same process forthe production is a batch. Every cable product shall be subjected todeliveryinspection

9. 2. 3 Decision rule

For all delivery inspection items, if any item is notpassed the inspection, thecable isjudged to beunqualified

9.3 Type inspectior

a)Finalizing and appraising the new or old products transferred to other factory b)After finalizing formally, when there are major changes in the structure, materials and process,etc. c)After formal production, a test shall be carried out per three years. d)when construction resumes after suspending production for half a year or more. e)when there is bigger difference between delivery inspection result and last type inspection result. f)whenthe contract requires inspection.

9.3.1 Inspection items

For the delivery inspection items of cables, see table 6

客运专线预应力混凝土预制梁暂行技术条件(铁科技[2004]120号)Table 6the delivery inspection items of cabl

YB/T45432016

YB/T45432016

9. 3.2 Decision rule

DB45∕T 2524-2022 高速公路沥青路面施工技术规范For all typeinspection items,if anytest result is unqualified,the type inspection is judged to beunqualified. 10 Mark, quality fi le, Package. transformation and storage

For all type inspectionitems,if anytest result isunqualified,thetype iudged to be unqualified.

©版权声明
相关文章