Specification for Structural Steel Buildings.pdf

Specification for Structural Steel Buildings.pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:6.5 M
标准类别:建筑标准
资源ID:47297
免费资源

标准规范下载简介

Specification for Structural Steel Buildings.pdf简介:

"Specification for Structural Steel Buildings.pdf" 是一个关于钢结构建筑的详细规格说明书。这份文档主要涵盖了钢结构设计、施工、材料选择、结构分析、连接方法、抗震性能、耐火性能、以及其他相关工程标准和规范。它可能包括钢梁、钢柱、楼板、支撑系统等元素的尺寸、强度要求、安装指导、质量控制标准等内容,是建筑行业专业人士在进行钢结构项目设计和建设时的重要参考文件。

这份规格书旨在确保钢结构建筑的安全性、耐用性和符合相关建筑法规,提供了系统性和规范性的指导,以确保建筑物的结构稳定,能够承受预期的荷载,同时考虑到经济效率、环保和可持续性等因素。

Specification for Structural Steel Buildings.pdf部分内容预览:

SpecificationforStructural Steel Buildings,March9,2005 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

16.16xlvil

JG∕T 5061.1-1995 厚壁取土器ermally cut. Cut with gas,plasmaor las

Specification for Structural Steel Buildings,March9,2005 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

Specification for Structural Steel Buildings,March9,2005 AMERICAN INSTITUTE OF STEEL CONSTRUCTIOM

Specification forStructural SteelBuildings,March9,2005 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

GENERALPROVISIONS

his chapter states the scope of the Specification,summarizesreferenced specifi ode, and standard documents, and provides requirements for materials and c ocuments.

The chapter is organized as follows:

A1. Scope A2. Referenced Specifications,Codes and Standards A3. Material A4. Structural Design Drawings and Specifications

This Specification includes the Symbols, the Glossary, Chapters A through M and Appendices 1 through 7. The Commentary and the User Notes interspersed throughout arenotpartofthe Specification

User Note: User notes are intended to provide concise and practical guidance in the application of the provisions.

SpecificationforStructural SteelBuildings,March9,2005 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

REFERENCED SPECIFICATIONS.CODES AND STANDARDS

REFERENCED SPECIFICATIONS. CODES AND STANDARDS

Specification for Structural Steel Buildings,March9,2005 AMERICAN INSTITUTE OF STEEL CONSTRUCTIOM

Research Council on Structural Connections (RCSC) Specificationfor Structural Joints UsingASTMA325orA490Bolts

A3.MATERIAL

A3. MATERI

SpecificationforStructural SteelBuildings,March9,2005 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

icationforStructural Steel Buildings,March9,20 IERICAN INSTITUTE OE STEEL CONSTRUCTION

Sect. A3.l

Ib. Unidentified Steel

Unidentified steel freeof injurious defects ispermittedtobeusedforunimportant members or details, where the precise physical properties and weldability of the steel would not affect the strength of the structure.

User Note: Additional requirements for joints in heavy rolled members are

User Note: Additional requirements for joints in heavy rolled members are given in Sections J1.5, J1.6, J2.6, and M2.2.

Steel Castings and Forgings

Cast steel shall conform to ASTM A216/A216M, Gr. WCB with Supplementary Requirement S11. Steel forgings shall conform to ASTM A668/A668M. Tes

nallconformtoASTMA216/A216M,Gr.WCBwithSupplementary nt S11.Steel forgings shall conform toASTMA668/A668M.Test

SpecificationforStructural SteelBuildings,March9,2005 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

User Note: ASTM F1554 is the preferred material specification for anchor rods.

SpecificationforStructural SteelBuildings,March9,2005 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

STRUCTURALDESIGNDRAWINGSANDSPECIFICATIONS

STRUCTURALDESIGNDRAWINGSANDSPECIFICATIONS

Fillermetals and fluxes shall conform toone of the following specifications o theAmericanWeldingSociety:

AWSA5.1 AWSA5.5 AWSA5.17/A5.17M AWSA5.18 AWSA5.20 AWSA5.23/A5.23M AWSA5.25/A5.25M AWSA5.26/A5.26M AWSA5.28 AWSA5.29 AWSA5.32/A5.32M Manufacturer's certification shall constitute sufficient evidence of conformity with the standards.Filler metals and fluxes that are suitablefor the intended application shall be selected

.Stud Shear Connectors

Manufacturer'scertification shallconstitutesufficientevidenceofconformitywit! AWSD1.1

A4. STRUCTURAL DESIGNDRAWINGS AND SPECIFICATIONS

A4. STRUCTURAL DESIGN DRAWINGS AND SPECIFICATIONS

ThedesigndrawingsandspecificationsshallmeettherequirementsintheCoded StandardPracticeforSteelBuildingsandBridges,exceptfordeviationsspecifi cally identified in thedesigndrawings and/or specifications

闽2004G104 钢筋混凝土桩基承台Specification for Structural SteelBuildings,March9,2005 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

DESIGNREQUIREMENTS

neral requirements for the analysis and design of steel structures that are applica allchaptersofthespecificationaregiveninthischapter.

The chapteris organized asfollows

B1. General Provisions B2. Loads and Load Combinations B3. Design Basis B4. Classification of Sections for Local Buckling B5. Fabrication,Erection and QualityControl B6. Evaluationof Existing Structures

B1. GENERAL PROVISIONS

OADSANDLOADCOMBINATION

DB33∕T 1140-2017 住宅工程分户质量检验技术规程B3.DESIGN BASIS

©版权声明
相关文章