GB/T 51154-2015 海底光缆工程设计规范(英文版).pdf

GB/T 51154-2015 海底光缆工程设计规范(英文版).pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:13.3 M
标准类别:综合标准
资源ID:59972
免费资源

标准规范下载简介

GB/T 51154-2015 海底光缆工程设计规范(英文版).pdf简介:

GB/T 51154-2015 "Underwater Optical Cable Engineering Design Specifications" (Chinese Version) is a technical standard specifically designed for the engineering design of underwater optical cable projects in China. This standard sets out guidelines, requirements, and best practices for the planning, installation, and maintenance of underwater optical cables used in telecommunications, data transmission, and other maritime applications.

The 2015 edition provides a comprehensive framework, covering aspects such as cable selection, route planning, installation techniques, environmental impact assessments, cable protection measures, and safety protocols. It also includes specifications for cable design, including minimum bending radii, water depth limits, and performance criteria under various environmental conditions.

In English, it would be titled as "Underwater Optical Fiber Cable Engineering Design Code" or similar, translating the technical terminology and concepts from Chinese to English. The PDF version of this standard would contain detailed technical specifications, drawings, and explanations, serving as a valuable resource for engineers, designers, and contractors involved in underwater optical cable projects.

GB/T 51154-2015 海底光缆工程设计规范(英文版).pdf部分内容预览:

General Provisions

2TermsandSymbols

2. 1.Submarine repeate

31层框支剪力墙高层住宅塔楼施工组织设计2.1.5Cable landing poin

2. 1. 6 Cable landing station

2. 1.7 Sea wall

2.1.10Deep sea sectio

2. 1. 17 Route survey

3SystemConfigurationand SystemCategorization

3.1 System Configuration and Categorizatior

digital transmission systems shouldwork at the

4Digital Transmission System Design

4Digital Transmission System Design

4. 1Generic Requiremer

4. 4Submerged Equipment

4.8System Reliability

4. 8System Reliability

4.9System Maintenance Margin

4.9.1The maintenance margin for a system within design life should be designed according to the followingrequirements: 1 The number of repairs for land cable between the landing point and the landing station may be considered to be one per 4km,but should be no less than 2 in total; and the loss for each splice may be taken as 0.14dB. 2For the inshore section and the shallow se ion,repairsmay be considered to be oneper15km but should be no less than 5 in total; for the deep sea section,it may be considered to be one per 1,oookm; the loss of each repair shall include the attenuation of inserted submarine cable and joint attenuation,the length of inserted submarine cable may be calculated as 2. 5 times the sea depth,and the joint attenuation may be considered to be O. 4dB foreach repair. 3The maintenance margin of a submarine cable repeaterless transmission system shall be no more than5dB.

5SubmarineCableLineDesign

5.1Cable Route Desk Top Study

5. 1Cable Route Desk Top Study

5. 2 Submarine Cable Route Survev

5.2.1Before conducting route survey,the installation institution shall obtain a permit for submarine optical cableroutesurvey. 5.2.2The route survey shall make clear the submarine geological and engineering conditions,marine meteorological and hydrological environment,marine planning and development activities, and other

conditions and confirm the optimal cable route,the requirements for submarine cableprotection,the way of installation.etc.

onauctorissubject tono strct restrictonyet snaiimeet tnerequirements ofacabie iauittes

5. 4 Land Cable and its Installation Requirements

PerformanceParameters ofDigitalTransmission SystemandCableLine

3.1Performance Parameters of Submarine Cable

6.2Performance Parameters of Digital Transmission System

of CodeforDesign of Wavelength Division Multiplering(WDM)OpticalFiber Transmission Systems EngineeringYD5092;

2The path error performance objectives shall be in accordance with those specified in Tal Table 6. 2. 1 Path error performance objectives of a WDM submarine cable repeatered system

2 Path BER equals BBER divided by the s

Requirements forLanding Station anditsAuxiliary Facilities

CJJ/T 291-2019标准下载8InstallationofTerminal StationEquipment

9 Design of Power Feeding System

i0Designof AuxiliarySystems

l1 Maintenance Tools and Test Instruments

I1.0.1Maintenance of a submarinecable system includesmaintenance of thewetplantwhich covers the submarine cable and submerged equipment,and maintenance of dry plant which coyers the land cable and andingstation equipment. 11. 0. 2 The configuration of maintenance tools and test instruments shall meet the demand of routine system operation and maintenance,and instruments shall be selected based on priee and practicality. Maintenance tools and test instruments for a submarine cable system may be configured according to Table11. 0. 2

11.0.1Maintenance of a submarine cable system includes maintenance of the wet plant which covers the submarine cable and submerged equipment,and maintenance of dry plant which coyers the land cable and andingstation equipment, 11. 0. 2 The configuration of maintenance tools and test instruments shall meet the demand of routine system operation and maintenance,and instruments shall be selected based on priee and practicality. Maintenance tools and test instruments for a submarine cable system may be configured according to Tahle11.0.2.

le 11. 0. 2Maintenance tools and test instruments for a subm