标准规范下载简介
GB/T 51152-2015 波分复用(WDM)光纤传输系统工程设计规范(英文版).pdf简介:
"GB/T 51152-2015波分复用(WDM)光纤传输系统工程设计规范(英文版)" is a technical specification in China that outlines the guidelines and requirements for the design of WDM (Wavelength Division Multiplexing) fiber optic transmission systems. This standard provides detailed procedures, criteria, and best practices for engineers working on the planning, installation, and operation of WDM systems, which are widely used for transmitting multiple data, voice, and video signals over a single optical fiber.
The document covers various aspects such as system architecture, component selection, network planning, error correction coding, system testing, and maintenance procedures. It also emphasizes on ensuring the compatibility, reliability, and efficiency of the WDM systems while adhering to international standards.
The English version of this specification caters to the global audience, facilitating the understanding and implementation of these design principles by professionals worldwide who work with or are interested in WDM technology.
Please note that accessing the PDF directly is beyond my capabilities as an . You can search for this standard online through official publishing platforms or authorized distributors for a copy.
GB/T 51152-2015 波分复用(WDM)光纤传输系统工程设计规范(英文版).pdf部分内容预览:
2.1.11 Raman amplifie
ARaman amplifier is an optical amplifier used to amplifysignals based on the stimulat cattering(SRS)effectof thetransmissionfibers oftheWDM system. 2.1.12(Optical) coherent detection
System Configuration andCategorization
3.1CharacteristicsofWDMSystem
全套高档别墅施工图3.2System Configuration
2.1WDM system configural
3.3ApplicationCodes
Table 3.3.1The meaning and value of each character in the application codes of DWDM system
Table 3.3.2Application codes of DWDM systems
Table 3.3.2(continued)
Table 3.3.3The meaning and value of each character in the application codes of CWDM system
.3.4The application codes of a CWDM sy .3.4.
3.3.5The application code of wDM system shallbe determined according to such factors as station configuration,fiberparameters,systemcapacity,etc.
3.4CentralWavelengthAllocation
Thenominal central wavelengths of thechannelsof CWDM systems shall be in accordancev se specified in Table 3.4.2.
0.4.2 those specified in Table 3.4.2
Table3.4.2CWDM svstem channel wavelengthallocationplar
3.5MainPathInterface
3.6 OTU Interface
(WDM)Systems. 3.6.4The CWDM systemschannel signal interfaceparameters at the S/Rreference point shall meet the requirementsof the currentprofessional standardYD/T1326TechnicalRequirements of Coarse WavelengthDivisionMultiplering(CWDM)
ptical SupervisoryCha
4TransmissionSystemDesign
5 AuxiliarySystems
5.1NetworkManagementSystem
总统别墅建筑施工图O NetworkProtection
6.1Network Topology
TransmissionSystemPerformance
Transmission SystemPerformance
JGJ 33-2001 建筑机械使用安全技术规范 英文版7.2BitErrol
7.3.2The requirement of WDM systemsinput jitter tolerance shall be the same as that of theOTU interface's inputjittertolerance
7.3.2The requirement of WDM systemsinput jitter tolerance shall be the same as that of theOTU interface's inputjittertolerance,