YD/T 5131-2005 移动通信工程钢塔桅结构设计规范(英文版).pdf简介:
YD/T 5131-2005 "Mobile Communications Tower Mast Structure Design Specifications" (英文版) 是中国的一项通信工程设计标准,它详细规定了移动通信基站中钢塔桅结构的设计要求、计算方法、构造详图以及相关检验与验收的规定。该标准适用于移动通信基站的高耸结构,如天线塔、信号塔等的建设,对钢塔的强度、稳定性、耐腐蚀性、抗震性等性能有严格的规定。
"YD"是中国邮政的英文缩写,"T"是技术标准的意思,"5131"是标准编号,"2005"表示发布年份。"Mobile Communications Tower Mast Structure Design" 指的是移动通信塔桅结构设计,"Specifications" 则表示设计规范。英文版的PDF文件可能包含图表、技术参数、设计参数和详细的工程实施指南,是工程师在设计和施工移动通信塔桅时的重要参考依据。
YD/T 5131-2005 移动通信工程钢塔桅结构设计规范(英文版).pdf部分内容预览:
ppendix BTower Base Plate Calculation for Common Angle Steel Towe
Generally,the column foot of angle steel tower is connected by square base plate with stiffening rib and the design of tower base pate may be calculated according to the following formula (Fig.B.0.1).
3T·Yma V 1.146minf
DB37∕T 5080-2016 一体化预制泵站技术规程ere,T designvalueoftensionactingonthetowerbaseplate(N); Ymax maximumdistancebetweencenterof thefoundation boltandmain anglesteel (mm); 6 minimumwidthinallsectionsofbaseplate(mm)
AppendixCUpliftStabilityCalculationofBase
Uplift StabilityCalculationof Ba andAnchorPlateBase
AppendixDSpecificationsofCommonGalvanizedStrandedWire
Appendix E Explanation of Wording in This Code
GeneralProvisions
GeneralProvisions
2Termsand Symbols
BasicDesignProvisions
sicDesignProvisio
3.1Design Principles
3.1Design Principles
3.3Material Selection
4Structure Calculation
4StructureCalculation
4.4Guyed Steel Mast
4.4 Guyed Steel Mast
MemberandNodeConnection
MemberandNodeConnection
5.2MemberDesign
5.2MemberDesign
5.3Node Connection Design
5.3.3In weld connection,different design strengths are adopted according to different quality levels.
5.4Connection Calculation of Flange Plat
5.5CalculationofTowerBasePlate
StructureandProcessTechnicalRequirements
Structure andProcess TechnicalRequirements
6.1GeneralRequirements
6.2NodeConnection
1Such requirement is provided in order to ensure that the binding ratio of internal and external anglesteelataconnectionnodeisnotlessthan75%. 2If the space between major member and web member is too large,it is disadvantageous to rigidity outside gusset plate surface; if too small,it is not convenient for construction. 3When the angle a between the gusset plate edge and the member axis is less than 15°,the gussetplate is narrow and long,disadvantageous forrigidity outsidegussetplate surface. 4The material is saved and stress eccentricity is reduced due to oversize thickness of gusset plate oy increasing rigidity of gusset plate rims (or adding stiffening plate)
SoGrade Cboltis adoptedfor shearresistance,butmeanwhilethis codeimproves requirement ofbolt diametertoreduceslippageinshearresistanceof GradeCbolt. 6.3.6This regulation is to prevent loose nuts from dropping 6.3.8This regulation is to ensure that towerbase plate bears stress uniformly,and in favor of bearing capacity offoundation anchorbolts. 6.3.9Wateriseasytoaccumulateattowerfeet,whichwill seriouslyrustfoundationanchorboltsand towerbaseplate,soprotectionreinforcementis necessary
Foundation and Base
CJ 131-2001 家用燃气燃烧器具结构通则7.1GeneralRequirements
General Requiremen
7.2Foundation Calculation
differencebetweenneighboringfoundations shallbe checkedunderdifferentfoundations
73BaseDesign
GB 7190.2-1997 玻璃纤维增强塑料冷却塔 第2部分大型玻璃纤维增强塑料冷却塔AppendixnternalForceCalculationforFlangePlate
ppendix BTower Base Plate Calculation for Common Angle Steel Towe
AppendixDSpecificationsofCommonGalvanizedStrandedWire